Logistics and warehouse facility

Logistics warehouses may have extensive rooftops, but roof area alone does not establish the economics of a PV system. Electricity use and building conditions are still decisive.

Understand the site's electricity demand

Assess lighting, handling equipment, loading docks, offices, ventilation and any vehicle charging demand. Understand current working hours and likely operational changes.

The technical challenge to address

Large roofs may accommodate more capacity than the building uses during daylight. Structural loading, waterproofing, shadows and maintenance access can also reduce usable area.

A practical feasibility approach

Commission appropriate structural checks, map the usable roof and compare solar capacities based on realistic on-site consumption.

Before sizing a system, the following checks are useful:

  1. Gather electricity bills, the supply contract and operating schedules.
  2. Obtain hourly load data or arrange appropriate measurements.
  3. Review usable area, structure, shading, protection and grid connection.
  4. Compare different solar capacities and self-consumption rates using documented assumptions.
  5. Model capital costs, losses, maintenance and financial scenarios.

Should battery storage be added?

Battery storage should not be an automatic addition. Its value depends on evening demand, tariffs and critical operating needs. Storage economics and backup capabilities must be assessed separately.

Frequently asked question

Can every part of a warehouse roof hold PV panels?

No. Structural loading, obstructions, safety clearances, access and roof waterproofing must all be evaluated.

What Helio Core can assess

Helio Core Technologies supports commercial and industrial PV projects in Morocco through site-specific analysis of electricity demand, electrical architecture, solar potential and maintenance requirements. Performance, savings and approvals depend on each site.

Request a site assessment.

Informational guide: no output, payback or grid-export eligibility is guaranteed without a site assessment and verification of applicable requirements.

Explore other sectors

See our commercial and industrial solar solutions in Morocco and Helio Core Technologies' other sector guides.

Planning a solar project?

We visit your site anywhere in Morocco and give you a written file.

Request a site study